Crude Oil Transloading Facility

The objective of this project was to construct a track facillity for the transloading of crude oil for Casper Crude to Rail. This project posed some unique challenges because of the restricted amount of space for construction, due to a large swath of wetlands to the east of the construction site. Because of these constraints, a unique approach to locating the loading site was taken, where the site was placed on the inside of the southern curve. An additional challenge posed by the limited space was in the inability to fi t three unit trains into the space. This problem was overcome using two length sidings on either on the of the two rail loops, which allowed for three unit trains to use the facility at one time.
Casper Crude to Rail

Casper, WY

April 2014 – December 2014

$60 Million

– NEWS –

360 Rail Services Acquires Railroad Specialties, Inc.

ENGLEWOOD, Colo. – A Denver-area company known for its comprehensive, full-service solutions for the rail industry has expanded its holdings with the acquisition of a railroad firm that specializes in infrastructure projects. 360 Rail Services, LLC announced it has...

read more

Rail Industry to Gain Valuable Resource in Colorado

Denver, CO – Larry Stockton (CEO) and Bob Olin (COO/President) announce the inception of 360 Rail Services, LLC. 360 Rail provides multiple services to the rail industry. Services include design, construction, design-build and operations. With the ability to go from...

read more