Grain Transloading Facility

360 Rail Services staff have performed rail planning, surveying, and rail infrastructure design/ construction for a rail served grain transloading facility in Alliance, NE. This project included the design and construction of a loop track and setout track to allow for grain cars to
be loaded. Our experienced engineers and construction team were able to create a facility in limited space that is capable of supporting an entire unit train.

LOCATION
Alliance, NE

LOOP TRACK                                         
8,114 Track Feet

BNSF SETOUT TRACK                           
522 Track Feet

TRACK FEET TOTAL
8,636 Track Feet