360 Rail Services completed the design and construction of a 9,100 track foot rail spur for an oilseed processing facility in eastern Kansas. Our expert engineers took the design of this facility’s track from an early stage and applied value engineering and an extensive knowledge of rail operations to provide our client with a track that could be constructed at a great price and operated with a very high degree of efficiency. This project was completed over a 10 month period. Our crews overcame unique environmental challenges with this project, such as the repeated flooding and freezing of the worksite during grading. Even with these challenges, the 360 team delivered track of the highest quality.